Heather Pointe Homeowners Association Annual Meeting 2019

Heather Pointe Homeowners Association Annual Meeting

Saturday, January 19, 2019
9:00a.m. 
 Pinson Community Center
 6230 Dry Creek Lane, Pinson Alabama 35216
Related image

NOTE:    *I am unable to transfer PDF to WORD or some other legible format, so I took pictures and placed them here
                **The following minutes are dated December 16, 2017. The year of the meeting is incorrect and should read                                 December 16, 2018. These same minutes were presented at the annual meeting to attending residents and                                 expounded upon by Bart Jones  of Metcalf Realty.

page 1

page 2


page 3


IMPORTANT --AT&T Fiber Upgrade Project 

AT&T  will be upgrading portions of its network in the Heather Pointe community.   It is uncertain as to when the work will begin, but probably in the summer or fall. The upgrade will take place regardless  to whether you have Spectrum, Bright House, Charter or any other internet service.  About a week before the job starts, a door hanger will be placed  to make residents aware that the work is about to begin.

READ below the two page letter sent to the Heather Pointe HOA board and Metcalf Realty.




page 1



page 2

Frequently Asked Questions (FAQs)
regarding AT&T Fiber Upgrade Project

Additional questions should be addressed  to AT&T customer concern at 1-800-278-8213
    Additional FAQs can be found  by clicking this link and going to the bottom of the page. 

Processes,  Procedures and Materials
Materials Used

  • Fiber Optic Cable
  • 1.5" Orange Pipe (Innerduct)
  • 10"x 15" Handholes (Water Meter Boxes)
  • 17"x 30" Handholes
  • 30"x 48" Handholes


Handhole Example                                 These vaults are installed flush with ground level. Larger                           
Image result for handholes electrical
handhole placement

                                             vaults  will contain splice locations and larger terminals. The smaller vaults will contain smaller terminals and individual lines to homes. All vaults will be connected  with 1.5" pipe placed 24" below ground. What this allows is once all of the new facilities have been placed, when a customer orders service AT&T will only have to bury a new line on their property. The rest of the line will be carried in the pipe and vaults to the property line, allowing less disruption to the community in the future.


Stitch Boring-Missile Boring
The fiber optic cables and pipe that is placed is done with a process called "stitch boring" or " missile boring". AT&T's contractor will dig 15"wide x 72" long x 27" deep holes every 20 to 50 feet depending upon the conditions and will drill holes between the holes to pull in the cable and pipe. 
When they dig the holes they first cut the sod and set it aside to save.  Then they spread tarp on the ground to protect the grass from the dirt as the hole is dug out.  All of the dirt removed from the hole is placed on the tarp.

Placed Handholes

 Once all of the cable is placed the holes are filled and tamped. Then the sod is replaced. In the areas around the handholes AT&T will also place grass seed and straw if necessary.Image result for grass seed and straw around handhole

                                                ⇛
Abandoned Car
A burgundy Honda Accord was parked at the corner of Jana Way and Princess Blvd. After a week the car was reported to the Jeffco Sheriff's Office. That same day deputies followed up and by running the license plate discovered who the owner was. The owner, who lives in Center Point was  visited and instructed by the deputies to move the car or it would be towed. The owner complied .

 Heather Pointe  Covenant at 6.10 states that no vehicle shall be parked on the street for more than 24 hours. (paraphrasing. See Covenants in the upper right hand of the blog page )
END***




Monday, January 14, 2019

December 2018 Financials


NOTE: The Annual Meeting of the Heather Pointe Homeowners Association, Inc. will be held Saturday, January 19, 2019 at 9:00a.m. at the Pinson Community Center, 6230 Dry Creek Lane, Pinson Alabama 35216


December 2018 Financials 
for 
Heather Pointe Community







Candidates for Heather Pointe Homeowners Association






Rules and Regulations
            You received the information below by mail.


END**